Data Centre Construction

GRAEPELS Hall: N4-N13 Stand: D49

The Data Centre Industry has seen major transformation as the demand for storage and processing capabilities continues to grow.

Traditional in-house data centers are on the decline as the creation of  Co-location Data Centers continues to expand due to their attractive solutions in managing cost, data, and providing up to date infrastructure at lower cost while sharing the benefits of resources and outsourcing support.

Graepels are well positioned in the market to offer comprehensive standard and bespoke solutions to meet our customers’ requirements within this rapidly evolving landscape.

With over 60 years of industry experience across the UK and Ireland our team of Engineers and Technical Specialists provide valuable insight and guidance into the capabilities and considerations in the application of Woven Wire Mesh, Perforated Metal and Laser Cut products.

Additional Engineered Metal products are available for a wide range of Industry sectors, not limited to Data Centers, including Construction, Industrial, Architectural, Safety and Security.

We understand it is frequent to have trade-offs between two of the most important components of data centers: security and cooling. High tensile and stainless-steel woven mesh and perforated metal products offer high percentage open area to enable ventilation for cooling, without compromising strength and integrity for security.

Our  experience in working closely with companies who provide end-to-end solutions for data center management, meeting our clients’ expectations every time thus resulting in quality products manufactured to exact specifications reducing downtime and disruptions to business operations.

Graepels have the manufacturing capabilities to perforate sheets and weave wire in various sheet sizes and specifications. In addition to manufacturing, we offer tailor made solutions, where required. For example, a customer’s transformer cabinet which were previously made from cumbersome frames with numerous cut-outs, have been transformed into sleek and efficient sheet metal cabinets without any framework by our in-house engineers. This design minimizes the need for touch-up adjustments and optimizes air flow.

Our experience in supplying 2D flat sheets has now progressed to supplying complete 3D kit forms, including the flooring. Our company is well-equipped to take on new challenges and is ready to discuss bespoke solutions with our customers. 

Graepels do not install our strong relationship with fabricators, ensures that we can work alongside them to provide a range of options that are tailored to meet the specific needs of each client.

Graepels is committed to supplying our products throughout Europe.

Pop by our stand and say hi at the Data Centre World 2023 show, where we will be exhibiting, Stand D49.

Loading

2023 Partners Included

Media Partner

  • Storage Magazine
  • Data Centre Magazine
  • Networking+
  • CEDaCI

 

Media Partner

  • Computing Magazines UK
  • Optical Connections
  • TechUK

 

Media Partner

  • Electrical Times
  • Dutch Data Centre Association
  • SDIA
  • OCP

 

Media Partner

  • CEO Media Group
  • AMPS

 

Media Partner

  • VMBlog
  • DevDiscourse

 

Media Partner

  • Data Centre Alliance
  • ExCeL
  • TechTarget

Media Partner

  • Lynchpin Media
  • Uptime Institute

Media Partner

  • Digitalisation World
  • Electrical Engineering

Media Partner

  • Data Centre Solutions
  • Packt
  • Intelligent Data Centres

Media Partner

  • Enterprise Security Magazine
  • Dunwoody
  • Top Business Tech

Media Partner

  • EM360
  • Silicon UK
  • Rela8

 

Media Partner

  • ICIO
  • iSME
  • ITC

 

2023 SPONSORS Included

Headline Sponsor

  


 

Registration Sponsor

Platinum Sponsors

Gold Sponsors

Silver Sponsors

Theatre Sponsors

Hosted Buyer's Day Sponsors

VIP Lounge Sponsor

Subscribe to our newsletter!

By submitting this form you agree to our privacy policy, have read and understood the Terms & Conditions below, and consent to receiving communications. You may opt out at any time.