Exhibitor Press Releases

Subpage Hero

Subpage Hero

Use the featured image to change the subpage hero.

Advancing Data Centre Construction: The Sustainable Edge of GRP Solutions

Relinea Stand: D50
Advancing Data Centre Construction: The Sustainable Edge of GRP Solutions

Adaptable Design for Ever-Evolving Data Centre Requirements:

 

While data centres are essentially industrial buildings, their functionality and design requirements are in a constant state of flux. Modern computer rooms, server rooms, and data centres need to be equipped to handle a vast number of data cables, efficiently manage high heat loads, and be adaptable to future technological and cooling advancements. Relinea’s inclusive range of expertise allows us to design, manufacture, and install GRP solutions that meet these dynamic demands, ensuring the longevity and efficiency of data centre operations.

Sustainability in the Spotlight:

 

In January 2021, the European Data Centre Association launched ‘The Climate Neutral Data Centre Pact,’ an initiative supporting the EU’s climate-neutral goal by 2030. The pact emphasizes the need for increased sustainability in data centre operations, placing pressure on the industry to become more efficient and environmentally conscious. Relinea rises to this challenge with sustainable GRP solutions. GRP products boast a low carbon footprint, requiring 75% less energy for production than steel and 50% less energy for transport and assembly.

 

Key Benefits of GRP Products:

 

  • Non-conductive: Ideal for live electrical situations, as GRP products do not require grounding.
  • Lightweight: 75% lighter than steel, eliminating the need for heavy lifting gear and specialised equipment during installation.
  • Low Carbon Footprint: Significant reduction in energy consumption for production, transport, and assembly compared to traditional steel.
  • Anti-Corrosive: Excellent resistance to corrosion, even in highly aggressive environments.
  • Slip Resistance: Integral grit finish provides the world’s highest slip resistance for walk-on surfaces, addressing safety concerns in the workplace.
  • Extended Life Cycle: A life span of 50 years with minimal maintenance, leading to substantial reductions in life cycle costs.

 

GRP Applications in Data Centre Construction:

 

  • GRP GIS Access Platforms
  • GRP Rooftop Access Platforms
  • GRP Internal Walkways
  • GRP Boundary Fencing
  • GRP Handrails
  • GRP Ladders
  • GRP Raised Access Flooring
  • GRP Riser Void Protection

 

Conclusion:

 

As data centres continue to play a crucial role in our technologically driven world, the construction industry must embrace sustainable and efficient materials. Relinea’s expertise in designing and implementing GRP solutions not only meets the evolving needs of data centres but also contributes significantly to the industry’s push for greater sustainability. With the numerous benefits of GRP products, Relinea offers a robust and environmentally friendly alternative, setting a new standard for the construction of data centres in the 21st century.

 

Loading

2024 Partners

Media Partner

Media Partner


 

Media Partner


 

Media Partner

Media Partner

Media Partner

Media Partner

Media Partner

Media Partner

Media Partner

Media Partner

Media Partner

Media Partner


 

Media Partner


 

Media Partner


 

Media Partner


 

Media Partner


 

Media Partner


 

Media Partner


 

Media Partner


 

Media Partner


 

Media Partner


 

Media Partner


 

Media Partner


 

Media Partner


 

Media Partner


 

Media Partner


 

Media Partner


 

Media Partner


 

2024 SPONSORS

Registration Sponsor

Platinum Sponsor

Theatre Sponsors

Lanyard Sponsor

VIP Lounge Sponsor

Gold Sponsors

Silver Sponsor

GET THE LATEST INDUSTRY NEWS IN YOUR INBOX!

 

Until show opens:

REGISTER FOR YOUR FREE TICKET